10 Eagle Street is the gold tower at the river end of the CBD. Thirty four levels, finished in 1978, and the tallest building in Brisbane when it opened. Abseil Pro cleaned the external glass here across 2017 and 2018, the second time as a full pass of every face.
It is an older tower and the shape of it is the job. The facade steps and angles rather than running flat to the ground, so a drop does not simply go straight down. Every face needed its own rig, and parts of it were only reachable by going out through a window rather than off the roof.
At a glance
Location
Brisbane CBD
Services
Exterior window cleaning
Access
Rope access, rigged from the roof and from setbacks
When
September 2017 and June 2018
Photos
On site
The clean
Bronze glass shows everything
Reflective glass is unforgiving. It shows every streak, every run mark and every panel that got missed, and it shows them from the street, because the whole face is a mirror. On a tower this size that means working to a system rather than a panel at a time, and finishing a drop properly before the rope moves.
On every clean
All external glass from the top down, including the angled and sloping faces
Frames, mullions and sills done with the glass rather than left behind
Drops sequenced top to bottom, so nothing already cleaned got dirtied on the way past
Setbacks and ledges cleared of debris while the crew was on them
Anything found on the facade photographed and passed on rather than left
How the 2018 clean ran
The 2018 clean was a full pass of the building, quoted at 150 hours. It ran from the fourth to the twentieth of June with three technicians, worked face by face and following the sun, so the glass was not drying faster than it could be squeegeed.
The tower was occupied the whole time, so drops were booked with the building and the crew worked around tenants rather than the other way round.
How we got to it
Rigged from the roof, and out through windows
Most drops were rigged from the roof. The tower steps in as it rises though, so parts of it were reached from setback ledges partway down, and some faces could only be got at by going out through an opening window on the floor above.
Working an occupied tower
Every drop passed somebody office window. Drops were sequenced and notified so nobody had a technician outside their desk all week, and exclusion zones went in on the footpath below with a spotter on the ground.
Eagle Street does not close. Everything was tethered, nothing came off the building, and gear was carried up rather than lifted from the street.
How we left it
Tools tethered on every drop, and nothing dropped from height
Exclusion zones and signage in before a drop started and packed away after it
Keys and passes back to the building before anyone left
Setbacks and ledges left clear, not used as somewhere to leave gear
Every photo tagged with the level and elevation
Photos handed over, so the building had a record of what was found
Challenges
What made this one awkward
The building is not a box. It steps and angles, so one rope line did not reach the ground and every face needed its own plan. That is setup time before any glass gets touched.
Parts of it could only be reached by going out through a window, which means working inside an occupied floor to get to the outside of the building, with everything that involves.
It sits on one of the busiest corners in the CBD, so the footpath below was managed for every drop rather than only at the start of the day.
Outcome
What the building got
A mirrored tower that read as clean from the street, on a building where one missed panel is visible from a block away.
These photos are from September 2017 and June 2018. It is on here because a stepped facade in the middle of the CBD is a fair test of whether a crew can plan a building rather than just descend one.