Brisbane Square is 37 levels and 151 metres of mirrored glass on the corner of George and Adelaide Streets, and it is a working building in the fullest sense. Council staff at their desks, a public library at ground level, a plaza and a busway entry underneath, and George Street traffic on one side. All of it keeps running while the crew is on the glass above it.

We clean it on a quarterly cycle. Every visit is rigged off the roof, worked down the elevations in sets, and finished at ground level with water fed poles on the awnings, the library entry and the shopfront glass.

At a glance

Location

Brisbane CBD, 266 George Street

Services

High rise window cleaning, glass restoration

Access

Rope access off the roof, poles at ground level

Frequency

Quarterly


The clean

Cleaning a building that never closes

The facade is mirrored glass wrapped in steel sunshade blades with perforated screens behind them. It is not a flat elevation a technician slides down. Every drop threads between the blades, and the panels behind them are the ones that show every mark from the street.

What the clean covers


External glass across the elevations, cleaned from rope


The sunshade blades and the screens behind them, worked from inside the structure


Awning and canopy glass over the George Street footpath and the plaza


Library entry, shopfront and ground level glass, cleaned with water fed poles


Staining polished out of individual panels where washing will not shift it

How a clean runs

Drops are rigged on the roof first thing, before the building fills up. The crew works down the elevation in sets, and the landing zone under each drop is cordoned on the plaza before anyone goes over the edge.

Most of the glass comes up with pure water and a squeegee. Where a panel has picked up something washing will not move, it gets buffed on the rope with a battery rotary and a cutting compound before the squeegee work, then cleaned as normal. The panels that need it are usually the same ones each time, high on the corner facing Adelaide Street and North Quay, where hard water staining keeps coming back.


How we get to it

Off the roof, into the blades

Site inductions are done before anyone arrives. Keys and roof access are signed out, ropes are rigged off the roof beams, and the first drops are on their way down before the plaza fills up for the day.

Working inside the sunshade

The blades sit off the face of the building, so a technician has to work inside the structure rather than hang clear of it. Each drop is threaded through, and the rope is protected wherever it runs over steel.

Below every drop is a public footpath, a plaza, a busway entry or a library door. Nothing goes down without a cordon under it, and the cordon moves with the crew rather than sitting out across the whole building all day.

How we leave it


Every tool tethered, and nothing loose carried on the rope


Cordons and signage under each live drop, moved as the crew moves


Hoses run clear of the entries and taken up whenever the crew is off the tools


Keys and roof access passes back to building management before anyone leaves


Roof doors locked and the building manager spoken to before the crew vacates


Photos uploaded the same day, so the record exists whether or not anyone asks for it


Challenges

What makes this one awkward

It is a public building on a public corner, and none of the ground under it is ours. The plaza, the footpath, the busway entry and the library door all have to keep working while drops are live above them.

The sunshade blades are the other half of it. They add hours to every elevation, because a technician cannot simply pass the glass, they have to get in behind the steel and work back out again.

And because the glass is mirrored, the standard is set from the street rather than from the rope. A panel that looks fine at arm length can read badly from the plaza, so the check is done from the ground before the crew packs up.


Outcome

What the building gets

A facade that holds up from the footpath. On mirrored glass the difference between a clean building and a nearly clean one is obvious from a block away, which matters more on a civic building than on most.

A quarterly cycle keeps staining off the panels instead of letting it set, and the handful that do pick something up get buffed on the same visit rather than turning into a separate job months later. Heavy calcification rarely comes off in one go, so buffing the same panels each cycle is what keeps the build up under control.