Gasworks Residences sits on the corner of Longland Street in Newstead: sixteen levels of glass balustrades, aluminium louvres and painted concrete above a retail podium and a pool deck. Abseil Pro has been the building's rope access contractor since 2020.

Six years on one building means the crew is not working it out each visit. The clean runs to a scope written elevation by elevation, and the anchors they hang off are ones we installed and certify.

At a glance

Location

Newstead, Brisbane

Services

Window and facade cleaning, vine removal, height safety

Access

Rope access, rigged from the roof

Frequency

Facade clean annually, anchors certified each year


The clean

One scope, four elevations

A tower like this is not one surface. Glass balustrades, aluminium ledges, horizontal and vertical louvres, kitchen and living room windows sitting behind those louvres, painted concrete, a glass awning over the walkway and a glass roof above the foyer. The scope is written face by face so nothing is assumed and nothing is missed.

What the clean covers


Glass balustrades, aluminium ledges and the horizontal slats in front of them, north and south faces


Windows and glass behind the fixed vertical louvres on the east and west faces, with the louvres cleaned at the same time


Painted concrete facade elements on all four faces that cannot be reached any other way


The glass awning over the walkway, the glass roof above the foyer and the gym windows at level 16


Retail frontage at ground level, including the exhaust louvres above the roller door, degreased without touching the door mechanism

How it is run

Cleaning is pure water through a brush head on most surfaces, with traditional window cleaning, a mechanical scrub or pressure used only where the substrate calls for it. Drops start at the type 4 apartments and work clockwise around the building, so the corner apartments are all done in one pass instead of twice.

Owners are offered their private balconies at the same time, booked and paid for with us directly, so the ropes already on the building get used twice. Anything that will not come off is written up and reported rather than quietly left.


Height safety

The anchors, installed and certified by us

Every drop on this building hangs off the roof anchor system. We installed a large part of it and we certify the whole register each year.

What the system covers


34 ConcreteLink inserts with collared eyebolts installed in 2025 to extend the system


Anchors, static lines, cast-in soffit anchors and gutter ladder brackets from level 1 through to the rooftop


Post installed anchors pull tested to 7.5 kN, everything else a visual inspection, all to AS/NZS 1891.4


A certificate and an asset register listing every asset, where it sits and whether it passed

Certified before it lapses

The inspection runs annually, on a day the crew is on the roof anyway. That keeps the certificate current rather than renewed after somebody notices it expired, and it means the register is checked by the people who hang off it.

Anything that fails is tagged out on the spot so nobody can use it, and rectification is quoted separately rather than folded into the inspection.


How we get to it

Rigged from the roof, over a building in use

Everything is rigged from the roof. Gear goes up, drops come down the elevation, and the ground stays open. Underneath the facade is a podium with gardens, a pool deck, a walkway and retail tenancies, all of it in use while the crew works.

Working over the podium

Drops are planned around what sits below them. Exclusion zones go in under live drops with a spotter on the ground, and the crew works one elevation at a time so the building is never closed off in more than one place at once.

Resident balconies sit in the middle of most drops. Where a balcony is directly under the work it is cleaned as part of finishing that face, with debris kept out of the balcony drains rather than washed down them.

How we leave it


Tools tethered on every drop, and nothing dropped from height


Exclusion zones and signage set up before a drop starts and packed away after it


Boom gate and lockbox codes used as agreed, and every access door locked behind the crew


Retail and the pool deck kept open, with the drops sequenced around them


Anything that would not clean up written into the report rather than left for someone to find


Photos uploaded the same day, so the record exists whether or not anyone asks for it


Outcome

What the building gets

A facade cleaned to the same written scope every year by a crew who already know which windows sit behind which louvres, and which drop reaches them. Nothing gets rediscovered, and the scope does not quietly shrink.

The rest follows from already being on the building. The anchors are installed and certified by the same people who use them, and vine removal happens off the same rig rather than as a fresh mobilisation. One contractor, one point of contact, and a written record of everything done above head height.